
Kitchen remodel · Lakeview · 2026
Birchwood Lane Kitchen
- Investment
- $65k–$75k
- Duration
- 7 weeks
- Size
- 310 sq ft
- The problem
- A closed-off 1978 kitchen with a load-bearing wall between it and the living room. The owners wanted one open room without a beam hanging through the middle of the ceiling.
- What we did
- Engineered an LVL beam set flush into the ceiling, moved the sink to a new quartz waterfall island, added a pantry wall of cabinetry and wove new white-oak flooring into the existing floor.
- The result
- Finished two days ahead of schedule and within 1.5% of the written quote. The only change order was an upgraded range hood the owners chose mid-project.



